The new Arthur Phillip High School is the first high-rise public high school in NSW with a capacity to accommodate 2,000 secondary students. The facilities include flexible learning spaces with adaptable/moveable furniture and room configurations. This is truly a showcase school designed to meet the needs of metropolitan Sydney’s increasing student community.
Westlab is proud to have been engaged for the delivery of the school science laboratories. We worked closely with the contractor to achieve this on time and ready for start up beginning of 2020.
The installation of the laboratories included:
The outcome achieved was a stunning space, focused on student outcomes and ongoing flexibility.
Utilising the proprietary Australian made ‘Modulab Connect’ benching system, that can be further adapted in the future for the changing requirements.
Avoid expensive redesigns, compliance headaches and budget blowouts before your lab project gets underway.
Get My Free Lab Design